Friday, March 2, 2012

Hidden stagging under control!!!!


Controls for the hidden staging tracks are done!!!

I spent the last three days working on and trouble shooting a Diode Matrix Control for the hidden yard ladder. I say trouble shooting because after I wired it all up on Wednesday, I couldn't get it to work. I spent the last two days checking everything and scratching my head. I finally noticed that I'd put a diode in backwards. DHOOOO!!!

I'm happy to say that this morning I got it working like a top and love it. I found the schematic on David K. Smith's site here: http://whiteriverandnorthern.net/clinics.htm   David was super helpful in helping me out with my questions. I'm glad I did the controls this way.

Here you can see the hidden staging entrance/exit at Meridian. In the bottom right of the photo is a red knob that is the rotary switch for the diode matrix. I'm working on a label for the switch and am also going to put a small dry erase board above it so that I can write consist numbers for the locos in staging. You can also see the video monitor that I use to watch trains in the staging yard.

Sunday, February 26, 2012

Switching Crawford Grain

Today, I played with photographing the layout. I tried different lighting techniques and did my first ever photo stack to get good depth of field. This photo is the result. I'm not 100% happy with the white balance in the shot but it's much improved over other shots I've taken lately. I hope to get to experiment more with the camera soon.

Thursday, February 23, 2012

Bridge in and slow order removed.....

 Crawford overpass is in and trains can run again!!! The track was ballasted and secured with white glue mix. Once dry, I brushed on layers of different colors of Bragdon's weathering powder. The rails were painted with a Floquil "Rust" paint pen. After it dried, I used a stiff brush to take most of the paint back off of the rail and the ties that it got onto. Plus, the brush helped work in the powder. Spring is almost here so green stuff should start sprouting soon.

Monday, February 20, 2012

Paving roads

I've gotten my first two roads in and about done. This first photo is the main street coming out of Crawford. You can see the glue drying on the gravel drive that goes to Crawford Grain. This road T's into HWY 45 as you can see in the distance. If you take a left on HWY 45, it will take you to the bridge below. This road was poured with Woodland Scenic's paving plaster. I then brushed on a thick coat of white glue and added a layer for fine ballast. After it dried, I sanded it then painted with Ralph Lauren "River Rock" series paint finishes then sanded again, appliedvstripping, sanded again followed by a dusting of India Ink wash.
This is the HWY 45 underpass at Crawford. I've got the bridge temporarily set while adding the finishing touches to the road. The road that turns off to the left just beyond the bridge leads to the TXI cement plant. This road was done with drywall spackling then painted with Ralph Lauren and finished like the other road.

Thursday, February 16, 2012

It's been almost a month since my last update. I've actually gotten quite a bit done but just haven't posted. Right now, I'm kind of held up waiting on some parts to come from Walthers before continuing on. What you're seeing here is the start of my "Bad side of the tracks" in Meridian. This is a freelanced scene but is based on the ICG/Southern crossing in Meridian so the tracks are pretty close to the prototype. I'm waiting on some more curbing to come from Walthers to finish assembling the street. I hope to have them next week or so.

Here's a shot from the other side of the bridge. I've added the green stagnant summer water to the ditch and started on the ground cover. The double track in the background is the Southern and the single track in the foreground is the ICG as the two converge to cross in Meridian.

Sunday, January 29, 2012

Grain, Bridges and Passenger Platforms

I've made some more progress on Crawford Grain. Piping on the grain legs are in along with the safety wire along the loading tracks. Also a little more scenery.


I've also started some work in the Meridian yard. Today, I poured one of the passenger platforms Meridian Union Station.I'm modeling Meridian from the North looking South so the passenger station will be off the layout to the left. In other words, when looking at the layout, you would be looking from the station out across the yard.
I've also begun work on the 18th Ave bridge over the North end of the yard at Meridian.

Friday, January 13, 2012



I was able to get some more work done on Crawford Grain today. First, I got a photo mosaic backdrop printed off and pasted up. I then blended the backdrop sky color onto the photo sky color. At first, I tried to do this with an airbrush but I got too much over-spray on the photo and on some scenery so I went to a brush and feathered it in. I like how it turned out.

Next, I started adding the structures that I'd been building on for a while. I've gotten most of the main structures in place. Next comes the details.

Been a slow layout week...

I've had a slow week working on the layout as I got involved in a few DCC installs on some locomotives. One thing I've learned is DC...