This BLOG will chronicle the design and construction of a proto-freelance HO scale model railroad. I've based this layout on the area that I grew up in. This line is no longer in use but I will try to keep it alive in my own way. The purpose of the layout is to enjoy running trains. PERIOD. It will not be prototypical to any era or road. I just want to run trains that have or could have run on the line through Starkville, MS. plus a few extras.
Tuesday, May 12, 2009
Lots of rain outside = Lots of work on the layout inside!!!
Tuesday, May 5, 2009
Lots of progress
The last few days have seen a lot of progress on the Aberdeen Sub. I've completed painting the backdrop......I think.
I'm trying to decide if I want to add clouds and a horizon or just leave it as is. Originally, I had planed on it just being a plain blue but now I'm thinking of feathering in some white haze and maybe adding those clouds. Not sure yet.I've also started laying the spline roadbed for the upper deck and have made good progress there. If I work like I did today, I should be able to get about 16' of spline in each day. I'm limited by glue drying time and the number of clamps I have to hold it together but this has worked to my advantage. While the glue is drying, I work on other items then come back to continue on spline, let glue dry and work elsewhere and on and on. In doing that today, I was able to get some of my wiring cleaned up and secured, build under-layout shelving for my DCC components, build a pull out desk for a laptop to run DecoderPro and pull all the wiring for a new 110 volt circuit to feed the DCC system. When I built the house, I had two dedicated switched circuits for the layout room. It turned out that this was not enough power. My layout lighting takes up those two circuits. The new circuit will also be a switched circuit to track power. When complete, I'll be able to hit three lighted switches when I leave the room and know that everything is off. This will be nice to during construction as I can turn on my layout lighting yet have the track dead so I don't have to worry about tools laying across the rail.
Saturday, May 2, 2009
Painting the back drop
My third attempt at a backdrop is going well now. The Komatex has worked out great.
For the seams, I used green Squadron putty. I squeezed on a bead of putty and smoothed it with a straight edge and let it dry over night. This morning, I sanded it with some 200 grit sandpaper on an orbital sander. That method worked GREAT. This is the first coat of paint and as you can see, the seam is GONE!!! You can see a chip at the bottom where the two pieces meet. The last shot is just an over all shot of the two decks. The top painted and the lower yet to be painted.Been a slow layout week...
I've had a slow week working on the layout as I got involved in a few DCC installs on some locomotives. One thing I've learned is DC...
-
I've had a slow week working on the layout as I got involved in a few DCC installs on some locomotives. One thing I've learned is DC...
-
Some motivation and free time led me to the train room this past week. I had a local historical group come for a visit so the room got a de...
-
My immediate plan is to get all bridges on the layout completed this month. Got several more to go. Here's my next project, the Washing...