Spanning Tibbee

I've run out of track and am waiting on Micro Engineering to make more. Hope to have some next week so I can finish the lower deck main. In the mean time, I've been working on the bridge across Tibbee Creek. Here is the real deal again for reference. 

 

So far, I've completed construction of the Central Valley 150' Pratt Truss Bridge. As you can see, this bridge kit is a great fit for the prototype. This is actually two Central Valley kits bashed into one. Notice on the South (right) end of the bridge, there is a steel deck approach. I had to use the decking from a second CV kit to build this. I also did a few minor changed to the truss as opposed to what the CV instructions said. Over all, it was a fun kit to build. Now for a little sanding, primer and paint. 

The concrete section on the North (left) end has also been a treat to build. I had planned on scratch building this section until someone saw this blog and pointed me to The Scale Segmental Bridge Co. , www.scalebridge.com . They had a kit that was a dead match for this concrete span and it's been a delight dealing with that company. I have to admit that I've had about the best overall kit building experience with this kit than any other kit I've ever constructed from ordering, company support, packaging and to the actual building of the kit itself. A+ product. You'll see more of their bridges on my layout as I move forward. I'm sure we'll also see some exciting products from them in the future.

Thursday, September 11, 2008

The first run of the CAGY!!!!!

I'm rolling along pretty good. Today, I finished getting the reverse loop in around the helix. This loop will represent the Columbus and Greenville's track from West Point at Prestage Farms on West to Greenville. I put a curved switch in going around the loop that will lead to an expanded area that will actually be Greenville one day. 
 
Here, the CAGY makes it's first run to Greenville and back with some leased IC power. :)
The part that I enjoyed about his was the wiring portion. I'm using the NCE PH-PRO R system and a DCC Speciallists PSX-AR for the reverse loop. I wired all that in this morning. VERY simple and it works wonderfully.

Tuesday, September 9, 2008

Lift up section in place


Progress, progress, progress!!!! My original track plan included a helix at both ends of the layout. This would offer continuous run loops over the whole layout. The second helix was going to connect the Meridian yard to the Louisville yard. After getting the first helix in, I realized how much real estate these things eat up. I wanted to keep the middle of the room as open as possible for seating and such. So, back to the drawing board. In order to have continuous run capability, I was going to have to cross a doorway that led into my workshop and attic. I didn't want to cross this but finally decided to instead of the second helix. I toyed with several ideas including lift outs, swing outs, duck unders.....etc. I finally decided to give a lift up a try. I mounted some heavy duty 36" draw slides vertically on 2X4 supports. Now, the section lifts up like a draw bridge. So far, so good but I've yet to lay track across it and run a train. That will determine if I'm successful or not. Here you can see it in the lowered position and the raised position. It's held up by carriage bolts insterted into holes drilled into the 2X4s.  I hope to get some track layed across it soon. I'll report back when that's done and a train crosses...a few times. : ) 


Working on Tibbee Bridge

I've been working on building the bridge that will cross Tibbee Creek. It's been a fun project so far. 

Here is a shot of the Central Valley kit almost complete. I've still got a few parts to apply before it hits the paint booth. I went out yesterday to get a paint chip for a good match. Hope to get it painted soon. 

 In the mean time, I'm starting to gather materials to build the wooden approach trestle as seen here. I plan on building it out of scale lumber and am trying to find a good glue to use and a good stain that will match the creosote color of the bents. Any suggestions would be appreciated.

Saturday, August 23, 2008

working towards Artesia...

Track continues to get laid around the room. Here, I'm approaching the yard at Artesia. The crossover is in place and the wye switch is soon to be placed.

 

This is a view of the prototype. You can see the crossovers and yard beyond.

 

Another view of the Artesia yard. The crossovers are at the bottom on the photo.

The iron horse rolls...

I finally got enough track down to start rolling some trains. In the photos is a Proto 2000 IC GP9 with DCC and sound. I'm using an NCE Power Cab to run the layout at present but the Powerhouse Pro Radio is sitting in a box ready to be installed next week or so. That's tropical storm Fay knocking at the window.

This photo shows the CAGY to the Left and the track leading towards Tibbee Creek Bridge on the right.
 
This is the Tibbee Creek bridge. I hope to get started soon on the Central Valley Truss kit that is almost a perfect match. The rest of the bridge, concrete and trestle will be scratch built.

Laying the iron......

I started the track work as I built the helix. I did the helix track first then started the rest of the layout at the CAGY interchange.
In this photo, the Aberdeen Sub main is the track to the far right. The left three tracks are the Columbus & Greenville tracks at the Prestage Farms mill in West Point. The CAGY interchange is at the top of the photo. The real CAGY with Prestage farms can be seen here: http://maps.live.com/default.aspx?v=2&FORM=LMLTCC&cp=pkymn67m8wvf&style=b&lvl=2&tilt=-90&dir=0&alt=-1000&scene=13301879&phx=0&phy=0&phscl=1&encType=1
 
 
This was my first attempt at a bridge on the layout. It's a basic Walthers kit that I thought turned out well. This kit built as it is, is almost a perfect match for the trestles near the Tibbee Creek bridge. The real bridge can be seen here: http://maps.live.com/default.aspx?v=2&FORM=LMLTCC&cp=pkr4m47mdmq4&style=b&lvl=2&tilt=-90&dir=0&alt=-1000&scene=13359954&phx=0&phy=0&phscl=1&encType=1
 
This view shows the helix, the Aberdeen sub main exiting the helix and the CAGY reverse loop over the sub main. Of course, in real life, there is no double track main around here nor does the CAGY cross the sub anywhere with a bridge but I liked this idea so that's how I built it.

Been a slow layout week...

I've had a slow week working on the layout as I got involved in a few DCC installs on some locomotives. One thing I've learned is DC...