This BLOG will chronicle the design and construction of a proto-freelance HO scale model railroad. I've based this layout on the area that I grew up in. This line is no longer in use but I will try to keep it alive in my own way. The purpose of the layout is to enjoy running trains. PERIOD. It will not be prototypical to any era or road. I just want to run trains that have or could have run on the line through Starkville, MS. plus a few extras.
Friday, December 16, 2011
Second attempt at ballast
My second attempt at laying ballast went much better. This time I used Arizona Rock & Mineral's ballast. It went down much easier and held it's color. I've applied some Bragdon Weathering power to give a weathered look. Still got work to do but it's getting there. I will say that I'm not a fan of laying ballast yet.
Subscribe to:
Post Comments (Atom)
Been a slow layout week...
I've had a slow week working on the layout as I got involved in a few DCC installs on some locomotives. One thing I've learned is DC...
-
I've had a slow week working on the layout as I got involved in a few DCC installs on some locomotives. One thing I've learned is DC...
-
Some motivation and free time led me to the train room this past week. I had a local historical group come for a visit so the room got a de...
-
My immediate plan is to get all bridges on the layout completed this month. Got several more to go. Here's my next project, the Washing...
No comments:
Post a Comment